Residential Existing Drawings Pack in Pinner, North West London

Results at a Glance

Survey visit booked to match Friday-only access window

Draft existing drawings pack issued for review before final release

Complete existing set produced: plans, elevations, section and site/location plan

Final DWG, PDF drawings and site photographs issued in one handover

The Challenge

The client needed a full set of existing (as-built) drawings for a residential property in Pinner to start work from accurate measured information. The required pack included two floor plans, a roof plan, three elevations, one section, and a site/location plan.

A key constraint was access: the property could only be surveyed on a Friday, with a short agreed arrival window in the afternoon. The client also needed the drawings promptly so work could begin as soon as the information was available.

Our Solution

We scheduled a measured building survey to align with the Friday-only access requirement and confirmed the surveyor details in advance to keep the visit straightforward. Following the site visit, our team processed the measurements and produced the requested existing drawing set.

To minimise back-and-forth and keep the project moving, we issued a draft drawings pack first so the client could review layouts and key information before finalising. After the review stage, we packaged and issued the final drawings and related files, including CAD and PDF formats alongside site photographs.

What We Delivered

Existing floor plan – Level 1 (measured)

Existing floor plan – Level 2 (measured)

Existing roof plan

Existing elevations (set of 3)

Existing section (1)

Site/Location plan

Draft drawing pack for client review prior to final issue

Outputs Delivered

DWG

PDF

The Process

Agreeing Scope, Fee and Friday Access
We confirmed the scope for an existing drawings pack and the specific sheets required: two floor plans, one roof plan, three elevations, one section, and a site/location plan. We also confirmed access constraints so the survey could be planned around the client’s Friday-only availability.
On-Site Survey
We booked the measured building survey for Friday, 14 November 2025, with an agreed afternoon arrival window. Surveyor details were shared in advance to keep access simple on the day and to ensure the visit could run efficiently within the available time.
Cross-Checking Before Leaving
Our surveyor attended the property and captured the measurements needed to produce accurate as-built drawings. This included the information required for plans, elevations, and the section, alongside photographs to support drawing production and help validate site conditions during CAD work
Turning Survey into Plans and Elevations
Using the survey measurements, we produced the full existing drawings set and issued a draft pack for review. This step allowed the client to check the drawing set in context before final issue, helping reduce delays and ensuring the outputs matched the requested scope.
Draft Review and Final Handover
After the review stage, we issued the final drawing pack and related files. The handover included CAD (DWG) and PDF drawings alongside site photographs, so the client had a complete, consistent set of survey-based information ready to use for the next stage of work.

Project Metrics

14 November 2025

Survey date

7 (2 plans, 1 roof plan, 3 elevations, 1 section) + site/location plan

Drawing sheets produced

Existing drawings pack (draft + final issue)

Deliverables package

Friday-only access with afternoon arrival window

Access constraint

Results & Impact

The client received a complete existing drawings pack for the Pinner property, covering floor plans, roof plan, elevations, a section, and a site/location plan. With the final DWG and PDF files plus photographs issued together, the client was able to begin work using a consistent, survey-based set of drawings.

Project Gallery

Plan Craft Daily

Planning Ready 2D Drawings

Services Used

Project Details

Property Type

Residential

Location

Pinner, North West London

Area

London (Harrow)

Time Taken

Approx. 10–11 days

Completed

November 2025