The client needed measured drawings and supporting site photos for a property at Gloucester Road (Studios Lane area) in West London, with the survey and drawing return timed to support an intended submission the following week. The key constraint was coordinating access and keeping the survey visit tightly scheduled within a 4:00–4:30 pm arrival window.

After the initial enquiry, the project moved quickly from confirming survey dates to completing the visit and producing a draft drawing pack for review. The client also requested that photographs were included alongside the drawings to support downstream use by the wider project team.

Our Solution

PlanCraftDaily confirmed the survey booking for 29 September 2025 and shared the surveyor’s contact details in advance to streamline access on the day. Following the site visit, we prepared a draft drawings pack and issued it to the client for review so any final checks could be completed before releasing the final set.

Once the draft pack was confirmed, we completed the drawing production and compiled the final deliverables into a clean handover package. This included CAD and PDF formats plus the site photographs requested, ensuring the client had the correct file types for design coordination and onward submissions.

What We Delivered

Measured survey site visit (scheduled arrival window)

Draft drawings pack for client review

Final existing/as-built drawings in PDF

Final CAD drawings (DWG)

Site photographs

Outputs Delivered

DWG

PDF

The Process

Agreeing Scope, Fee and Friday Access
We confirmed the property details, the required outputs (drawings and photographs), and the timing expectations tied to an upcoming submission. This ensured the survey scope was clear from the outset and that access arrangements and file-format needs were agreed before scheduling.
On-Site Survey
The survey was booked for 29 September 2025 with an agreed 4:00–4:30 pm arrival window. We provided the surveyor’s contact details in advance and confirmed the team would be on time, helping the client coordinate access smoothly on the day.
Cross-Checking Before Leaving
Our surveyor attended site within the agreed window and captured the measurements needed to produce accurate existing/as-built drawings. This measurement-first approach created a reliable base for the drawing set and reduced the risk of inconsistencies when the files were used by others later.
Turning Survey into Plans and Elevations
We produced a draft drawings pack and issued it for client review. This stage allowed the client to check the information before final issue, keeping communication clear and ensuring the final pack matched what was needed for onward coordination and submission work.
Draft Review and Final Handover
Following review, we issued the final package containing the CAD (DWG), PDF drawings, and site photographs. Deliverables were supplied as a complete, organised set so the client could immediately share files with the wider project team and proceed without chasing missing formats.

Project Metrics

29 September 2025

Survey date

4:00–4:30 pm

Arrival window

6 October 2025

Draft pack issued

6 October 2025

Final drawings & files issued

Results & Impact

The project completed with a full set of measured outputs issued: final drawings in DWG and PDF, plus site photographs. The structured draft-to-final workflow and clear scheduling helped the client stay aligned with their planned submission timeline and reduced the risk of delays caused by missing or mismatched site information.

Project Gallery

Plan Craft Daily

Planning Ready 2D Drawings

Services Used

Project Details

Property Type

Location

Ealing, West London

Area

London

Time Taken

Around 2 weeks

Completed

September–October 2025