The client needed a measured survey and a complete existing (as-built) drawing pack for a property in Ealing, West London. The key requirement was to capture accurate existing information and return a set of drawings suitable for downstream design and coordination.

The main challenge was coordination on the survey day. The agreed arrival window shifted later than expected, which required active communication to keep site contacts informed and ensure access was maintained. Managing expectations and keeping the site visit on track was essential to protect the overall programme and maintain confidence in the delivery.

Our Solution

PlanCraftDaily confirmed the survey booking and shared the surveyor’s details in advance to support smooth site coordination. On the day, the team provided updated arrival information as soon as it became available, acknowledged the disruption caused by the delay, and improved clarity around communication so the site team could plan accordingly.

Following the site visit, we progressed the measured information through drawing production and an internal quality assurance phase. Once QA was complete, we issued the full draft drawings pack for review, then moved to final issue after client sign-off. The final handover included the agreed drawing formats alongside supporting site photographs.

What We Delivered

Measured building survey site visit (existing conditions capture)

Existing floor plans (as-built)

Existing elevations (as-built)

Existing section drawing(s) (as-built)

CAD drawings (DWG)

PDF drawing set

Site photographs

Outputs Delivered

DWG

PDF

The Process

Agreeing Scope, Fee and Friday Access
We confirmed the site address, required existing outputs, and agreed a survey date and arrival window. Surveyor contact details were shared in advance to support access and on-the-day coordination, with the client asked to confirm who would be present on site for handover and entry.
On-Site Survey
Our surveyor attended site and completed the required measured work. When the arrival time shifted later than planned, updated timing was communicated promptly so the site team could adjust. Access was confirmed and the survey was completed without issues once on site.
Cross-Checking Before Leaving
Survey information was converted into an existing (as-built) drawing set, covering the agreed views and details. The focus was on producing clear, consistent drawings that reflect measured site conditions and can be used as a dependable base for design coordination.
Turning Survey into Plans and Elevations
Before issuing, the drawings went through an internal quality assurance check to verify completeness and consistency. A full draft pack was then shared with the client for review, enabling any final checks to be completed before the final drawing issue.
Draft Review and Final Handover
After the draft pack review and client sign-off, we issued the final drawings in the agreed formats. The handover included both DWG and PDF files, along with site photographs, providing a complete, organised package ready for the next project stage.

Project Metrics

22 April 2025

Survey date

Ealing, West London

Location

Measured Building Survey + Existing Drawings (As-Built)

Services delivered

DWG + PDF + Site photographs

Final outputs

Results & Impact

The project concluded with the measured survey completed and the drawing package issued through a structured draft-to-final workflow. The client received the final existing drawings in DWG and PDF, alongside site photographs, providing a reliable baseline set for ongoing property work.

Project Gallery

Plan Craft Daily

Planning Ready 2D Drawings

Services Used

Project Details

Property Type

Location

Ealing, West London

Area

London

Time Taken

Completed