Home » Case Studies » Terraced House Measured Survey & Existing Drawings – Tooting, SW London
The client’s architect needed a measured survey and a reliable set of existing drawings for a terraced house in SW London to support proposal design work. Coordination was required around the homeowner’s availability, with clear expectations that the visit was solely for measurement and documentation.
After the initial draft pack was shared for review, the architect requested additional clarity around ceiling detail to help progress their proposal thinking. A further practical issue then arose at handover stage when the architect reported that files appeared to contain watermarks and asked for a clean set suitable for professional use.
We arranged the survey slot around the confirmed access window and shared the surveyor’s details to support smooth on-site coordination. The project was handled with the architect as the primary liaison, ensuring site access and communication remained straightforward for the homeowner.
Following the survey, we produced the existing drawing set covering the key views required for onward design: plans, elevations, and a section. After the architect reviewed the issue and confirmed watermarks were present on the files they had opened, we asked them to re-check the previously uploaded finals and then provided a direct download of the final, clean PDFs to remove any delays and ensure they had the correct pack.
Property type
Primary stakeholder
Drawing set
Formats issued
The architect received a complete existing drawing pack in DWG and PDF format, supported by site photographs, ready to use as a base for developing a garage conversion proposal. When a watermark issue was reported, the final PDFs were promptly reissued via direct download so the architect could continue without disruption. This survey was part of our work providing Measured Surveys across Wandsworth, including Tooting, with Existing Drawings prepared for architects and homeowners.

Property Type
Residential
Location
Tooting, South West London
Area
London
Time Taken
3–5 working days (existing drawings target)
Completed
April 2025
Get a free, no-obligation quote for your project. We’ll respond within 24 hours.