The client needed a measured survey and a set of existing/as-built drawings for a residential property in Wembley. A key constraint was that loft works were underway and parts of the first floor were still under construction, meaning some elements were not fixed or clearly indicated at the time of survey and drafting.
The project also required clear coordination around the site visit timing and access, followed by a structured review cycle with an architectural team providing annotated feedback on the draft pack. The drawings needed to reflect what could be confirmed on site, while transparently noting any areas where locations (such as stairs, doors, or windows to the first floor) could not be verified due to ongoing construction.
PlanCraftDaily arranged the site visit and completed a measured building survey focused on capturing the property’s current conditions as they existed at the time of inspection, including the areas impacted by live construction. Using the site measurements, we prepared an initial draft drawing pack and issued it for review so the architect could confirm requirements and provide mark-ups.
Following the client’s feedback, we updated the drawings and re-issued a revised draft pack. The revision included drawing notes highlighting the specific limitation encountered on the first floor, where there was no clear indication of stair, door, or window locations because that level was still under construction. Once revisions were completed, we issued the final drawing set in both PDF and CAD format, together with the project photographs.
Project reference
Survey window
Draft issued
Final issued

Property Type
Residential
Location
Wembley, North West London
Area
London (Brent)
Time Taken
7–10 working days (drawing production timeframe advised)