PROJECT BRIEF

The client needed a measured building survey and a coordinated set of existing drawings for a hotel to support the next stage of design and redevelopment. The team required internal and external dimensions presented clearly, including the parking areas, so the architect could proceed with proposed works.

On site, several practical constraints affected the capture of information. Some hotel rooms were inaccessible during the visit due to guest occupancy, and this was recorded and flagged on the drawings. Externally, dense planting and inconsistencies in the existing markings made it difficult to define boundaries and measure the full car park and garden areas with the same certainty as internal spaces. The client also highlighted the importance of recording level changes across the property (steps and ramps), which needed to be captured and shown in the drawing set.

WORK COMPLETED

PlanCraftDaily scheduled and completed the measured survey, then produced a draft drawing pack for review. The drawings were prepared for architectural use and set out to include both internal and external dimensions in line with the reference sample provided by the client team.

During drafting, the survey observations were translated into clear notes so the project could move forward without ambiguity. Level changes were carefully recorded and marked on the plans, supporting design decisions where thresholds, steps, and ramps impact layouts. For the external areas, the team incorporated as much car park detail as possible based on measurable points available on the day, while communicating the limitations created by dense planting and inconsistent markings. Where higher certainty would be required for redevelopment of external areas, a topographical survey was recommended for improved accuracy.

Measured survey completed for a multi-level hotel building, including level changes.

Draft drawing pack issued for architect review, with inaccessible areas clearly noted.

External car park layout included as far as site conditions allowed, with limitations explained.

WHAT WE DELIVERED

Existing basement floor plan (PDF)

Existing ground floor plan (PDF)

Existing first floor plan (PDF)

Existing second floor plan (PDF)

Existing roof plan (PDF)

Existing car park plan (PDF)

Consolidated CAD drawing file (DWG)

OUTPUTS DELIVERED

DWG

PDF

plancraftdaily-logo

Plan Craft Daily

Planning Ready 2D Drawings

Project Details

Property Type

Commertial

Location

Binfield, Berkshire

Area

Berkshire

Time Taken

Approximately 3–4 weeks

Completed

June 2025

OUTCOME

The client received a complete set of existing drawings in DWG and PDF, including basement, ground, first, second, and roof plans, plus a car park plan. The architect was able to review the draft pack, request any revisions, and proceed with the next phase using a consistent, survey-based drawing set that documented access constraints and on-site limitations clearly.

STEPS

01.

Brief and scope confirmation

We confirmed the requirement for survey-based existing drawings for architectural use, including clear internal and external dimensions. The client highlighted the need to include the parking areas and to show level changes throughout the building. Reference samples were reviewed to align drawing presentation with the architect’s expectations.

02.

Site scheduling and access coordination

A site visit was booked and a named point of contact was agreed for coordination on the day. The surveyor’s details were shared for smooth access. Any access risks were noted in advance, including the possibility of some rooms being unavailable due to hotel occupancy.

03.

Measured building survey on site

The team completed the measured survey and recorded key information needed for redevelopment work. Level changes (steps and ramps) were captured as a priority. Where areas were inaccessible at the time of the visit, these were documented so they could be clearly identified within the drawing set.

04.

Draft drawings and technical review

A draft drawing pack was issued for the architect’s review. External areas were included as far as site conditions allowed, with limitations explained where dense planting and inconsistent markings affected certainty. The client was invited to return consolidated feedback so revisions could be addressed efficiently.

Survey and drawing support

Planning a similar project?

Send the property address, any existing information and the drawings required. Plan Craft Daily can confirm whether a site survey is needed and provide a quotation.