The client needed existing plans updated with fire-safety annotations for a commercial property in East Malling, Kent. The drawings were required for building control review and needed to show fire-resisting doors, alarm provision, escape lighting, signage and protected escape routes.

The brief included a detailed mark-up request. Internal doors were to be noted as FD30, smoke detectors were to be shown in rooms, a heat detector was required in the kitchen, and the alarm was to be labelled as an L1 system. The plans also needed emergency lighting, call points, extinguishers, a fire control panel, fire signage and the fire assembly point in the rear garden.

Additional coordination was needed around blocked-up windows, children’s toilet block dimensions and the exact placement of smoke detectors.

WORK COMPLETED

PlanCraftDaily reviewed the client’s mark-ups, example drawing and clarification notes before progressing the drawing updates. The team confirmed how the blocked windows were to be treated externally and clarified the meaning of the marked internal dimensions before completing the first drawing issue.

The annotated plans were prepared to show the required fire-safety information, including protected corridor areas, primary exit arrows, signage, call points, alarm panel position, detector locations and safety equipment notes. The drawings were then issued with the related project files.

After review, the client and consultant provided further comments on detector locations, room labels, toilet provision, kitchen detection and the control panel position. PlanCraftDaily updated the drawings and DWG file, then completed an additional revision once the client clarified the smoke detector positions.

Existing plans annotated for building control review

Protected corridor and primary exit route marked clearly

Door, alarm, lighting, signage and equipment notes added

WHAT WE DELIVERED

Annotated existing plans

FD30 door notes

Smoke detector and heat detector annotations

Emergency lighting and call point annotations

Protected corridor and primary exit route markings

Fire signage and fire assembly point note

Extinguisher, fire blanket and control panel annotations

OUTPUTS DELIVERED

DWG

PDF

plancraftdaily-logo

Plan Craft Daily

Planning Ready 2D Drawings

Services Used

tool

Project Details

Property Type

Commertial

Location

East Malling, Kent

Area

Kent

Time Taken

Initial files issued 26 January 2026; revisions completed 29 January 2026

Completed

January 2026

OUTCOME

The client received updated existing drawing files with the requested fire-safety annotations for building control review. The drawing set was revised through several rounds of feedback, including updates to detector locations, room uses, escape route information and control panel placement, helping the client progress with a clearer annotated plan set.

STEPS

01.

Brief Review

The client requested annotated existing plans for a commercial property in East Malling. PlanCraftDaily reviewed the mark-up, example drawing and written notes covering fire-resisting doors, detector provision, emergency lighting, call points, signage, protected routes and the rear garden assembly point.

02.

Clarifications

Before progressing the drawings, PlanCraftDaily clarified key points in the brief. This included how the blocked windows would be treated externally and what the marked internal dimensions referred to, helping ensure the annotations matched the client’s intended building control submission information.

03.

Initial Drawing Updates

The team updated the existing plans with the requested annotations, including door ratings, detector positions, alarm system notes, emergency lighting, call points, extinguisher locations, signage, protected corridor markings and primary escape route arrows. The first completed files were then issued for review.

04.

Revision Coordination

Following review, the client and consultant provided further comments on detector placement, room use labels, toilet areas, kitchen detection and the fire control panel position. PlanCraftDaily gathered the confirmed amendments and updated the drawings to reflect the revised requirements.

Survey and drawing support

Planning a similar project?

Send the property address, any existing information and the drawings required. Plan Craft Daily can confirm whether a site survey is needed and provide a quotation.